ACTIVITIES OF ARMY ENGINEERS UNDER EAST INDIA COMPANY |
1823 | First Irrigation Office opened at Saharanpur. |
l | Remodeling of old Moghul Canal on left bank of Yamuna taken up and commissioned as Eastern Yamuna Canal in 1830. |
1840 | Construction of Ganga Canal started and completed in 1854 |
1874 | Commissioning of Agra Canal |
1878 | Commissioning of Lower Ganga Canal |
1879 | Unprecedented famine took heavy toll of life in Bundelkhand |
1880 | First Famine Commission set up |
l | Commission recommended that 40% of the cropped area should be provided with irrigation facilities. |
CENTRAL PUBLIC WORKS DEPARTMENT ESTABLISHED |
1885 | Betwa Canal opened to Irrigate Jalaun and Hamirpur districts. |
1903 | Second Famine Commission setup |
l | Commission reiterated the provision of Irrigation facilities as above. |
1913 | Hydro Power Station on Upper Ganga Canal started at Bahadrabad (Near Hardwar) |
1930 | Tube well construction commended in Meerut Distt. |
1939 | Steam Power Station at Sohawal in Distt. Faizabad to supply Power for pump Canal on River Ghaghra. |
1939 | Separate Hydro Electric wing named "Hydel" was set up in deptt. |
1950 | Hydro Electric wing seperated, Electricity Deptt was formed. |
1954 | First flood work entrusted to Irrigation Deptt. |
1945 | After IInd world war, emphasis on grow more food schemes. Investigation of new projects. Commercial policy underwent radical change at independence emphasis was on welfare of presentoverall deployment of State. |
1949 | Research Institute at Roorkee was formed. |
1961 | Rihand Dam completed : project cost Rs 28 crores. |
1961 | On completition of second five year plan following major measures was taken : Setting up of central Design Directorate at Lucknow. Central Organisation at Lucknow for procurement of Store & Equipment at Lucknow. Creation of Post of Chief Engineer for each major project. Creation of Post of Engineer in Chief. Creation of Post of Liasion Officer at New Delhi for dealing import licenses and foreign exchange. Separate Organisation for looking after construction and operation of State tube wells under Director of Tube wells was setup on 31.07.1965. During severe drought in 1966, existing system of Irrigation was found inadequate, need was felt for lift irrigation and lift irrigation schemes were take up in act 1966 to fight unprecedented drought conditions
|
1968 | Directorate of Lift Irrigation was created. |
1968 | Main function of Irrigation Deptt in short are to deal with. Utilisation of water resources of state for the propose of irrigation by mean of Canals tube wells, dams, bundhies etc. Utilisation of water resources of state for Power Development. Flood control in river, improvement of damage, removal of water logging and training of rivers for protection of towns. Assessment of Irrigation revenue and collection of miscellaneous revenue occurring from Canals. In 1954 Building and Roads branch was named as P.W.D and Irrigation Deptt. Technical Audit Cell for Irrigation at Secretariat was setup in Sep. 1964
|